USACE CQC Plan Template: Written to UFGS 01 45 00 (Change 4, Aug 2026) | Editable Word + PDF + NAVFAC Guide
Your Contractor Quality Control (CQC) Plan is usually due within 30 days of award, and it is one of the first documents the Government reviews. This template gives you a complete, section-by-section starting point, so you fill in your project instead of writing a 50-page plan from a blank page.
Written to the current unified UFGS 01 45 00 Quality Control (08/23, Change 4: 08/26), the section that replaced the Army's 01 45 00.00 10 and the Navy's 01 45 00.00 20 and 01 45 00.05 20. Submittal content follows UFGS 01 33 00 (08/26), and the safety interface follows EM 385-1-1 (15 March 2024). Crosswalks are included in case your contract still carries an older edition.
Built by a USACE CQM-C certificate holder.
WHAT'S INSIDE
• CQC Plan Template, 56 pages, editable Word + PDF. One section for each required plan item in para 1.5.2.1 (a through r): QC organization and three-phase commitment, org chart, names and qualifications (CQM-C, QC Specialists, DQC Manager), duties and stop-work authority, outside organizations, appointment letters, submittal procedures and initial register, testing laboratory, testing plan and log, deficiency/rework tracking, daily reporting, design changes and the design-build DQC Plan, definable features of work (DFOW), three phases of control, special inspections, completion inspections, training log, and certifications log.
• Ready for binder assembly: tab numbers in the table of contents, a personnel matrix option, letters of direction for every QC role, and a self-check that maps the CQM for Contractors course QC Plan assessment checklist to the plan.
• Sections on QC meetings, QC certifications, the EM 385-1-1 safety interface (APP, AHAs per DFOW, daily QC/SSHO inspections), commissioning and the Certificate of Readiness, materials handling, and plan changes.
• Submittal section written to UFGS 01 33 00 (08/26): Government-furnished register and the contractor fields, certifying and approval statements, information-only timing, action and classification codes, and review periods.
• Guidance and worked example text in every section (an elevated water tank recoat). Delete them when you're done.
• Appointment letters: QC Manager, Alternate QC Manager, QC Specialist letter of direction, Submittal Reviewer.
• Compliance matrix that maps every UFGS 01 45 00 requirement to the section where you answered it, so you can check the plan before you submit.
• Government notification letters: preparatory/initial phase (2 business days), off-site work (2 weeks), final inspection (14 days), and QC organization change.
• NAVFAC & Commercial Variant Guide: Navy tailoring checklist (lab accreditors, invoice certification, design-build DQC, fire protection QC, daily reports), legacy Navy edition maps, and how to adapt the plan for state, municipal and commercial owners.
• Start Here guide with an 8-step quick start.
GOOD TO KNOW
• Instant digital download. Nothing is shipped.
• Not a substitute for contract-specific requirements; verify against your contract's specifications. No template can guarantee Government acceptance.
• License: one purchasing company, for its own projects. Please don't resell or share the files.
Independent product by Hold Point Prep. Not affiliated with or endorsed by USACE, NAVFAC, the Department of Defense or any government agency. The official specifications and Government forms are free at wbdg.org.
How this was made: designed with the help of AI software tools, then checked against UFGS 01 45 00 (Change 4), UFGS 01 33 00 (08/26) and EM 385-1-1 (2024) and tested before release.
Hold Point Prep is operated by Precision Integrity Contracting LLC, PO Box 101, Grove Hill, AL 36451.