Your Cart
Loading

Free CQC Three-Phase Control Cheat Sheet (PDF): Preparatory, Initial & Follow-Up Phases, UFGS 01 45 00 Change 4

On Sale
$0.00
Free Download
Added to cart

A free 2-page quick reference to the three phases of control on USACE and NAVFAC construction, written to the current unified UFGS 01 45 00 Quality Control (08/23, Change 4: 08/26).


Built by a USACE CQM-C certificate holder.


WHAT'S ON IT

• The three phases at a glance: when each happens, the notice to the Contracting Officer, who attends and how to document it

• What each phase covers, as a checklist (a summary of paragraphs 1.8.1 to 1.8.3)

• When to repeat the preparatory and initial phases (including the 45-day rule), off-site work notice and the Deficiency/Rework Items List

• Completion inspections: punch-out, pre-final and final acceptance

• Daily CQC reports, weekly QC meetings and test reports

• Common slip-ups to watch for


HOW IT WORKS

Enter your email and download the PDF right away.


Paraphrased summary for quick reference. Your contract's edited Section 01 45 00, its technical sections and your Contracting Officer's direction govern; older contracts may still carry UFGS 01 45 00.00 10 or 01 45 00.00 20. Independent product by Hold Point Prep. Not affiliated with or endorsed by USACE, NAVFAC, the Department of Defense or any government agency. The official specification is free at wbdg.org.


How this was made: drafted with the help of AI software tools, then checked and reviewed before release.


License: for the buyer's own use. Please don't resell, share or upload the files.


Hold Point Prep is operated by Precision Integrity Contracting LLC, PO Box 101, Grove Hill, AL 36451.

You will get a PDF (92KB) file